Atelier Rook
A small architecture studio for houses on difficult ground: slopes, floodplains, the last plot on the lane. Three people, one drawing board, no renders. Every drawing on this site is a drawing of the same house, and it draws itself as you scroll.
Sheet 06The practice
How a house gets from a walk on the site to a set like this one. One dense sheet, because that is what we would hand you.
How we work
We draw before we model. A section in pencil on the first visit, redrawn by hand until the levels are right. Software comes in at stage 3, and it is asked to keep what the pencil found.
We go in the rain. Every site is visited in bad weather before the brief is written. Where the water goes decides where the house goes.
We price at every stage. A cost plan is attached to every issue of the drawings from stage 1, so no decision arrives without its number.
We stay on site. One of us is on the build every week until the scaffold comes down; the drawings are updated from what was built, not what was hoped.
We are three. Two architects and one person who runs the office and the site diary. Larger jobs bring in an engineer we have worked with since 2019.
Stages, weeks and what you hold at the end
| Stage | Weeks | You receive | Fee |
|---|---|---|---|
| 0 Brief | 2 | One page: what the house is for, what it must cost | — |
| 1 Survey and feasibility | 4 | Levels, flood data, two site sections, a yes or a no | 5 % |
| 2 Concept | 6 | Plans, sections, a card model, cost plan A | 15 % |
| 3 Planning | 8 + 8 | The planning set, the flood statement, the neighbours met | 15 % |
| 4 Technical design | 10 | The full set at 1:50 and 1:5, specification, cost plan B | 30 % |
| 5 Tender | 4 | Three priced tenders, a recommendation | 5 % |
| 6 Construction | 40–60 | Weekly visits, the site diary, valuations | 25 % |
| 7 In use | 52 | Two visits, the as-built set, a year of answers | 5 % |
Fees are a share of the agreed fee, itself 11–13 % of the build cost for a new house. Stage 1 can be bought on its own; most people do.
Drawing register · Set 26-014 · The Weir House
| No. | Title | Scale | Rev A | Rev B | Status |
|---|---|---|---|---|---|
| 01 | Cover and site plan | 1:500 | 2026-08-30 | 2026-09-12 | Issued for the preview |
| 02 | Section A–A | 1:50 | 2026-08-30 | 2026-09-12 | Issued for the preview |
| 03 | Structure | 1:50 | — | 2026-09-12 | Engineer’s first pass |
| 04 | Light study | 1:50 | — | 2026-09-12 | Two noons only |
| 05 | Ground floor plan | 1:50 | 2026-08-30 | 2026-09-12 | Issued for the preview |
| 06 | The practice | 1:5 | — | 2026-09-12 | Issued for the preview |
| 07 | Contact | — | — | 2026-09-12 | Issued for the preview |
Sheet 07Contact
The last sheet of a set is the one with the practice on it. Ours is below, drawn to the same frame as the house.
- Practice
- Atelier Rook Ltd
architecture for houses on difficult ground - Studio
- 14 Cutler’s Yard
Lydford, over the bridge, first door on the left - Telephone
- +44 1822 000 140
Monday to Thursday, 9 to 6 - studio@atelierrook.example
answered within two working days - Partners
- Ana Rook, architect
Jonah Marsh, architect - Office
- Teodora Vale, practice manager
keeper of the site diary - Insurance
- Professional indemnity £2 m
public liability £5 m - A first meeting
- Two hours, on your site if it exists, free; bring the levels if you have them and the flood map if you don’t
The register is generated here, in your browser, from the sheets on this page; nothing is sent anywhere.
Revision table · colophon
| Rev | Date | Description | By |
|---|---|---|---|
| A | 2026-08-30 | First issue of the set for the Plate preview: seven sheets, one house. | AR |
| B | 2026-09-12 | Type set in Archivo Narrow and Public Sans (SIL Open Font License), served from this folder. | AR |
| B | 2026-09-12 | Every drawing authored as SVG in real units (centimetres; the detail in millimetres) with three pen weights. No photographs, no renders, no third-party art. | JM |
| B | 2026-09-12 | Built as one HTML document with CSS and a small script; native scrolling; the drafting cursor exists only for a fine pointer. | TV |
End of set7 sheets · 26-014 · Rev B